spacer
Stuctural Engineering And Design
Logo
Projects
Projects Photo
graphic
Commercial
Community
Education
Essential Services
Health Care
Historic Preservation
International
Justice
Parking Garages
Seismic Retrofit
Federal
Peer Review
graphic
image
image image About Us image What's New image Projects image Principals image Contact Us image
image image image
Education
image
Office Complexes : EBMUD Administration Building Seismic Retrofit

collage spacer
spacer   spacer
EBMUD Administration Building
1 graphic zoom in


The Crosby Group was entrusted by the East Bay Municipal Utility District (EBMUD) to provide design services to seismically retrofit their nine-story administration building in downtown Oakland. EBMUD is a vital agency that supplies water and provides wastewater treatment for parts of Alameda and Contra Costa counties on the eastern side of San Francisco Bay in Northern California.

This seismic retrofit project was challenging due to the requirement to bring the structure up to current life-safety standards and the need to maintain operational capability during the construction process. Prior to the upgrade the buildings welded beam/column connections were subject to fracture in the event of a large seismic event. The strategy was for Crosby Group to add passive energy dissipation (viscous dampers) to reduce the demand on existing connections. The retrofit included using a 3D nonlinear time history analysis with FEMA 351/252 as the benchmark.

LOCATION:
Oakland, CA

CONSTRUCTION COST:
$8.4 Million

COMPLETED:
2005

OWNER:
East Bay Municipal Utility District (EBMUD)

HIGHLIGHTS:
Prime Professional
Occupied Facility
Phased Construction
Fluid-Viscous Dampers


back




image image image

Copyright © The Crosby Group. All Rights Reserved.


image
image image image image image
image