spacer
Stuctural Engineering And Design
Logo
Projects
Projects Photo
graphic
Commercial
Community
Education
Essential Services
Health Care
Historic Preservation
International
Justice
Parking Garages
Seismic Retrofit
Federal
Peer Review
graphic
image
image image About Us image What's New image Projects image Principals image Contact Us image
image image image
Education
California Healthcare Facility (CHCF) - Design-Build
image
collage spacer
spacer   spacer
photo
1  2  3  4  5 graphic  
* Photos copyrighted 2013 HDR Architecture, Inc.



Crosby Group is the Structural Engineer-of-Record for the new 1.2 million square foot California Health Care Facility located on 400-acres in Stockton, California. This large-scale design-build Health Care Facility is set to meet the growing medical and mental care needs of inmate-patients within the California Department of Corrections and Rehabilitation system. The single-story, campus-style facility will house 1,722 inmate patients, encompass over 35 separate buildings, and meet an incredibly demanding 2-year start-to-finish design-build schedule.

Outside the secure perimeter is a 30,440sf U-shaped Administration building with offices, training rooms, break rooms and open office space. At the core of the secure facility stands an 158,000sf Facilities Shared Services (FSS) building providing health and support spaces such as a dialysis clinic, standby emergency medical services, diagnostic imaging and procedure center, D&T center management, physical medicine and rehabilitation, medical outpatient clinic, dental clinic, activity therapy/religious programs, pharmacy, specimen collection and processing, central health records, board of parole hearings, education program, library, visiting and program management.

Surrounding the core FSS building is a series of Housing Units ranging from 30 to 100-beds of various medical or mental health care levels depending on the residing inmate-patients including low acuity cubicle housing, low-acuity cell housing, high-acuity housing, intermediate care facility housing, and acute psychiatric program and intermediate care facility housing. The entire facility is surrounded by a secure perimeter fence with intermittent guard towers and controlled entry points.

LOCATION:
Stockton, CA

CONSTRUCTION COST:
$514 Million

COMPLETED:
2013

OWNER:
California Department of Corrections and Rehabilitation (CDCR)

HIGHLIGHTS:
1.2 Million Square Feet
1,722 inmate-patients
LEED Silver
Design-Build
BIM/Revit Modeled
OSHPD Compliant

AWARDS:
- 2014 DBIA-WPR Design Build Award of Merit


back


image image image

Copyright © The Crosby Group. All Rights Reserved.


image
image image image image image
image