Fire/Police Stations : Fremont Fire Station #8
|
|
Crosby Group provided structural engineering for the design of this new 10,086/sf three-bay Fire Station for the City of Fremont. The facility houses one engine company, with room for expansion, as well as reserve apparatus within the three bays. The fire station design consists of a 3- bay wide Apparatus Room, public lobby, internal staff work areas, and living quarters. Construction materials are concrete block masonry apparatus bay, wood framed walls, metal plate roof trusses, and concrete floor slab on grade.
LOCATION: Fremont, CA
CONSTRUCTION COST: $4.7 Million
COMPLETED: 2008
OWNER: City of Fremont
HIGHLIGHTS:
Essential Facility