|
|
|
|
|
|
|
K-12 : Valentine M. Peyton Elementary School
|
|
Crosby Group provided complete structural engineering services for a new K – 8
Elementary School campus for the Stockton Unified School District. This new school campus was built to accommodate
increased student enrollment and includes a 5,800 square foot Administration building, a 6,000 square foot Kindergarten
Classroom building, a 2-story 66,000 square foot Classroom building, a 5,900 square foot Library & Computer Lab building,
and a 15,000 square foot Multipurpose building including a stage and kitchen.
The Multipurpose building features custom
exposed wood and steel trusses, and the Classroom building utilizes two-story moment frames to maintain open spaces.
Crosby Group provided creative structural solutions to maintain the aesthetic vision of the project.
LOCATION: Stockton, CA
CONSTRUCTION COST: $23.9 Million
COMPLETED: 2009
OWNER: Stockton Unified School District
HIGHLIGHTS:
DSA Compliant
Campus Design
|
|
|
|
|
Copyright © The Crosby Group. All Rights Reserved. |
|
|