K-12 : Lexington Elementary School Multipurpose Building
|
|
Crosby Group provided complete structural engineering design services for this new one-story,
site built, 5,082sf Multipurpose Building as part of the rebuild of the Lexington Elementary School campus for the Los Gatos Union
School District. The original 50-year old dilapidated Lexington Elementary School campus was demolished to make room for a brand-new
modern campus providing a 21st century learning environment.
Crosby Group designed the light-filled, open and airy steel framed
Multipurpose Building on a sloping site with challenging foundation requirements including coseismic movement and differential settlements.
The Multipurpose Building provides flex-space for group gatherings and includes a stage with under-stage storage space, retractable
tables/benches, a warming kitchen, a data/electrical room, restrooms, and storage facilities, along with an adjacent trash/recycle enclosure.
LOCATION: Los Gatos, CA
CONSTRUCTION COST: $3.5 Million
COMPLETED: 2014
OWNER: Los Gatos Union School District
HIGHLIGHTS:
DSA Compliant
CHPS Design
Challenging Site
|
|
|
|
|