Higher Education : College of Alameda - Building A Modernization & Seismic Retrofit

collage spacer
spacer   spacer
photo
1 graphic


Crosby Group provided structural engineering design services for the modernization and renovation of Building A on this community college campus. The building is a two-story, 28,790 SF concrete structure constructed around 1968 and therefore it lacked the seismic performance level present in modern buildings.

The existing building was completely modernized and seismically retrofitted together with ADA updates. The seismic design included adding new concrete shear walls, a new elevator shaft and stairways together with major redesign and improvements of the foundation system. That included elaborate interaction between the existing pile system and the new foundation design using micro-piles.

LOCATION:
Alameda, CA

CONSTRUCTION COST:
$10 Million

COMPLETED:
2009

OWNER:
Peralta Community College District

HIGHLIGHTS:
DSA Compliant
Seismic Retrofit
ASA Upgrades
Micro-Piles