Higher Education : DeAnza Learning Resource Center
|
|
Crosby Group performed a renovation of the existing two-story, 50,000s.f. center to ensure
it met current code. The project also included the design of a new three-story, 40,000s.f. addition to the building. Crosby Group
completed the new building then interlinked the two via a two-story pedestrian bridge. The existing building needed an interim
revised moment frame design to met new CBC code requirements. The project was approved through DSA.
LOCATION: Cupertino, CA
CONSTRUCTION COST: $5 Million
COMPLETED: 1996
OWNER: Foothill-DeAnza Community College District
HIGHLIGHTS:
DSA Compliant
Pedestrian Bridges
|
|
|
|
|